Material sourcing guide

Thermal insulation for controlled envelope performance

Thermal insulation reduces heat transfer through roof, wall, floor and service layers. Specify the exact application, declared thermal performance and net coverage area so suppliers can quote the intended board, roll or loose fill with the right accessories and evidence.

Mineral wool and rigid insulation boards beside a reflective insulation roll.
Mineral wool and rigid insulation boards beside a reflective insulation roll.
01 / Materials & uses

Start with the right material groups.

Roof and facade boards

Separate boards by elevation, roof zone or soffit detail. State the project thermal requirement, any compressive requirement, facing and net area.

Underfloor and internal layers

Identify slab, screed or partition applications and the expected loading or access conditions. Ask whether the proposed board format suits the specified build-up.

Pipes, tanks and service insulation

Describe insulated services by line size, operating condition range and surface type. Require section or mat format, jacketing and fastening accessories as part of the package.

02 / Package boundaries

A material price is only part of the package.

Your material schedule
01Roof and facade boards
02Underfloor and internal layers
03Pipes, tanks and service insulation

One schedule, clearly separated scopes. This is a request outline, not an installation drawing.

Included materials

Thermal insulation boards, blankets, sections, loose fill and reflective membranes required by the approved application.

Connections & interfaces

Facing layers, vapour-control interfaces, tapes, fixings and edge accessories named for each thermal insulation package.

Confirm separately

Substrate condition, repair, cleaning, temporary protection and installation inspection confirmed separately by the project.

03 / A comparable request

Six details that make offers clearer.

Exact product designation
Provide the project-prescribed product name, facing type, board format and required thickness or thermal resistance.
Declared thermal performance
Ask for the supplier stated thermal conductivity or resistance for the proposed product, thickness and facing condition.
Application location and exposure
State whether the layer is exposed to weather, enclosed, below grade or in a service void before requesting alternatives.
Nominal dimensions and coverage
Request board or roll width, length, edge profile and declared coverage per pack, tied to the net take-off area.
Interfaces and accessories
Name the vapour control, tapes, fastenings, packers and termination details that must be quoted with the insulation layer.
Condition on arrival
Require packaging, pallet quantities, weather protection and storage condition commitments suitable for the programme.
Illustrative request lines
Item & descriptionQuantity
TI-01Rigid board insulation for roof zone A with declared thermal resistance, facing and thickness per approved schedule.840
TI-02Pipe section insulation for heating risers with matching jacket and closing accessories per service schedule.360 m

Example quantities only; no live prices or supplier offers. Use your project schedule for final values and ask suppliers to list deviations.

04 / Compare the whole offer

Three checks before you decide.

Application before thickness

Verify that each quoted product is offered for the stated roof, wall, floor or service application, not only an equal thickness.

Declared performance matches the request

Compare the supplier stated thermal resistance or conductivity for the proposed thickness against the project requirement.

Accessories are part of the package

Confirm which facings, tapes, fastenings and vapour-control interfaces are included, optional or supplied by another package.

05 / Practical questions

Details worth clarifying early.

Is board thickness enough to compare thermal insulation offers?

No. Ask for the declared thermal resistance or conductivity at the proposed thickness and confirm the application and facing type match the project schedule.

Should the vapour control layer be quoted with the insulation boards?

List the vapour control membrane, tapes and sealants explicitly. Ask the supplier to state whether they are included, optional or supplied under a separate package.

07 / Your next step

Turn your material schedule into a request.

Create a Matravo account to prepare your request. For account or sourcing-flow questions, visit support.