Mechanical, electrical and plumbing materials for your project.
Bring mechanical, electrical and plumbing requirements into one material schedule. Separate the systems, define the connections and give suppliers the project information needed to quote the same scope.
Identify the products you need.
Mechanical systems
For plant rooms and air distribution, list HVAC components, pumps, valves and meters by system. Keep equipment duties and connection details alongside the quantities.
Electrical materials
For floor-by-floor fit-outs, identify cables, containment and devices by their project requirements. Specify boxes, controls and accessories rather than assuming a complete kit.
Plumbing and drainage
Separate pipe lengths, fittings, sanitary connections and internal drains. A metre of pipe and a connected line with supports describe different supply scopes.
List materials, accessories and delivery terms together.

Main materials
Identify the pipework, electrical and HVAC items in separate schedule groups, with an agreed unit for each line.
Complementary products and delivery details
List fittings, supports, control wiring connections and drainage connections. Identify the supplier responsible for each shared component.
Ask what is excluded
Confirm testing, installation, commissioning and unloading as separate responsibilities; a material offer does not automatically include them.
Details to include in your request.
- System and location
- Name the service, floor and zone so similar-looking items are not substituted across different systems.
- Material and connection
- Record the specified material, nominal size and joint type. Add the drawing reference for equipment connections.
- Project requirements
- Copy pressure, temperature or electrical requirements from the approved design; do not estimate them from the photograph.
- Equipment duty
- Where relevant, attach the engineer's duty schedule and list the connected equipment or controls.
- Quantity and accessories
- Use metres, pieces or sets consistently. Identify fittings and supports included in each quantity.
- Documents and phasing
- Request product sheets and deviations against the schedule, with delivery dates separated by floor or phase.
| Item & description | Quantity |
|---|---|
| M-01Pipework for zone A; material and joint type per project schedule. Fittings listed separately. | 120 m |
| M-02Valve assemblies for zone A; connections and accessories per equipment schedule. | 24 sets |
Example quantities only; no live prices or supplier offers. Use your project schedule for final values and ask suppliers to list deviations.
What to check when comparing quotations.
Pipe versus connected line
Check whether fittings, valves, hangers and insulation are included before comparing the total.
Equipment and included accessories
Ask suppliers to identify optional controls, enclosures and connecting parts for every equipment line.
Exceptions and delivery phases
Compare declared technical deviations and the lead time for each phase, not only a single overall dispatch date.
Frequently asked questions
Can plumbing and electrical materials share a request?
Yes. Organize the request into separate system groups with their own units, documents and delivery phases so suppliers can state precisely what they cover.
Does the pipe price include fittings and supports?
Check fittings, valves and supports separately. Ask each supplier to map included and excluded items against the same schedule.
Which performance values should I enter?
Use the approved project design and the proposed manufacturer's documentation. This guide structures the request; it does not calculate an installation design.