Walls and roofing, with every edge accounted for.
Build a coordinated envelope request for masonry, roof coverings and facade materials. Set out the main surfaces alongside corners, trims and connections so the offer describes more than the visible finish.
Identify the products you need.
Masonry and blocks
List bricks, blocks and AAC by wall location, dimensions and project requirements. State the mortar or adhesive needed for each product.
Roof covering and accessories
For new roofs or refurbishment, describe the covering and the current roof detail. List ridge, edge and penetration pieces so they do not disappear into an area allowance.
Facade materials
Coordinate cladding and curtain-wall packages with the wall and roof envelope. Use the specialist facade guide for subframes, panels and opening interfaces.
List materials, accessories and delivery terms together.
List main materials and accessories as separate items. Use this checklist to prepare the information needed before requesting quotes.
Main materials
Identify measured wall and roof surfaces by material, location and finish, using the current elevation or roof plan.
Complementary products and delivery details
List corner pieces, flashings, trims, membranes and fixings, and identify the supplier responsible for each item. Check that shared components are not omitted from both quotations.
Ask what is excluded
State whether supporting structure, substrate preparation, access and installation are supplied separately.
Details to include in your request.
- Location and substrate
- Identify the wall or roof zone and the supporting surface to make compatibility questions explicit.
- Product dimensions
- State block, sheet or panel formats alongside the material description and measured area.
- Project performance
- Request evidence against the specified project requirements instead of relying on a general product claim.
- Detail revision
- Share the relevant roof or facade details, including junctions and penetrations, with revision dates.
- Accessories
- List corner, ridge, edge and connection components and identify their measurement units.
- Area and allowances
- Separate net measured surfaces from cutting allowances and ask suppliers to show their quantity basis.
| Item & description | Quantity |
|---|---|
| W-01Wall blocks for elevation A; format per wall schedule, mortar scope stated separately. | 320 m² |
| W-02Roof edge pieces for roof B; profile and finish per current detail. | 48 m |
Example quantities only; no live prices or supplier offers. Use your project schedule for final values and ask suppliers to list deviations.
What to check when comparing quotations.
Facing versus full assembly
Check whether the quote covers only the visible material or includes support and interface components.
Accessory completeness
Compare trims, fixings and corner pieces against the same drawing references.
Finish and batches
Agree sample review and matching requirements for visible adjacent surfaces before choosing an offer.
Frequently asked questions
Where do facade systems belong?
This category covers wall and roofing materials. Use the facade systems guide for more detail on panels, subframes, finishes and connections.
Should corners and trims be listed separately?
State whether each accessory is included in the area rate or measured independently. Request the same breakdown from each supplier.
Request quotes for your material list.
Create a Matravo account to prepare a request for quotation. Contact support for help with your account or request.