Material sourcing guide

Concrete pavers and kerbs for external hardscape

Use this guide to request concrete paving blocks, flags and kerb units as a measurable hardscape package. Keep paving formats, kerb profiles and laying-course materials separate so suppliers can price the specified scope clearly.

Grey concrete paving blocks beside a longer pale kerb section.
Grey concrete paving blocks beside a longer pale kerb section.
01 / Materials & uses

Start with the right material groups.

Paving units

Define concrete block or flag pavers by product name, face format, thickness, edge detail, finish and laying pattern. Give the net area to be paved and any required cutting allowance.

Kerb units and transitions

List kerb profiles, radius units, transition pieces and drop kerbs by location. Separate straight runs from curves, junctions, vehicle crossings and drainage-edge details.

Laying course and jointing scope

Identify whether bedding sand, jointing sand and sub-base materials are requested with the pavers, or supplied under a different package. State the package boundary clearly.

02 / Package boundaries

A material price is only part of the package.

Your material schedule
01Paving units
02Kerb units and transitions
03Laying course and jointing scope

One schedule, clearly separated scopes. This is a request outline, not an installation drawing.

Included materials

Include concrete paving blocks, flags, kerbs, transition and radius units measured by area and linear length.

Connections & interfaces

Clarify interfaces with drainage channels, access covers, inspection chambers, edging and adjacent wall or surface finishes.

Confirm separately

Confirm separately whether bedding, jointing, sub-base, cutting, lifting, transport, storage and installation are inside the package.

03 / A comparable request

Six details that make offers clearer.

Product designation
State the exact paver or kerb product name and the project-prescribed performance, face size, thickness or profile requirement.
Format and profile
Give paver face dimensions and thickness, or kerb cross-section and length. Identify chamfer, texture, nib or straight-face options.
Finish and colour
Describe the required surface finish and colour reference against the specified range. Request a sample or technical data sheet where comparison is needed.
Measured quantity and unit
State net paving area and linear kerb length separately. Show cutting, waste and spare-unit allowances as distinct quantities.
Laying pattern and joints
Identify the laying bond or pattern and joint width requirement. Confirm whether jointing material is quoted with the units or separately.
Site conditions and delivery
Name the installation area and required delivery timing. Detail lorry access, unloading point and temporary storage responsibility for the units.
Illustrative request lines
Item & descriptionQuantity
PK-01Rectangular concrete block pavers for courtyard path; specified product and face format to match approved sample.420
PK-02Straight concrete kerb units for access road edge; profile and length from roadworks detail.180 m

Example quantities only; no live prices or supplier offers. Use your project schedule for final values and ask suppliers to list deviations.

04 / Compare the whole offer

Three checks before you decide.

Paving against kerb scope

Check whether kerb bedding, backing concrete, radius units and junction pieces are quoted inside the paver area or as a separate linear item.

Product equivalence

Compare format, thickness, finish, edge profile and colour with the specification, together with documented project performance requirements. Submit differences for project review before treating an alternative as equivalent.

Delivery and handling limits

Confirm whether transport, offloading and positioning are supplier or buyer scope, and agree who manages protection and storage on site.

05 / Practical questions

Details worth clarifying early.

Should paving and kerbs be requested in the same package?

They can be grouped together, but keep paving measured by area and kerbs by linear length. Separate them in the request so each supplier uses the same take-off basis.

Are laying course and jointing materials part of the paver request?

Include them explicitly in the enquiry when required. Show bedding, sub-base and jointing quantities separately and ask the supplier to state what the offer includes.

07 / Your next step

Turn your material schedule into a request.

Create a Matravo account to prepare your request. For account or sourcing-flow questions, visit support.