Material sourcing guide

Fasteners and anchors, specified by substrate and duty

Fasteners and anchors join materials under load, movement and exposure. Record the exact product designation, substrate, dimensions, finish and measurable piece count so suppliers respond to the same scope. Separate general fixings from load-bearing anchors that require project-defined selection.

Steel anchors, bolts, nuts and brackets arranged beside hand tools.
Steel anchors, bolts, nuts and brackets arranged beside hand tools.
01 / Materials & uses

Start with the right material groups.

Mechanical fasteners

Set out bolt, screw, nut and washer types with thread, length, head form and coating. Ask whether matching washers and nuts are supplied under the same line item.

Anchors and structural fixing systems

Identify the base material, bore geometry, embedment and any project-prescribed anchor design. Request the supplier to name the exact product and reference evidence for alternatives.

Fixing accessories and installation components

Separate sleeves, collars, caps, setting tools and drilling accessories from the main fastener count. Confirm which components are packed with the anchor and which are ordered separately.

02 / Package boundaries

A material price is only part of the package.

Your material schedule
01Mechanical fasteners
02Anchors and structural fixing systems
03Fixing accessories and installation components

One schedule, clearly separated scopes. This is a request outline, not an installation drawing.

Included materials

Include mechanical fasteners with material, diameter, length, thread form, head type and coating as named in the requirement.

Connections & interfaces

Include anchors, sleeves, setting components and matched washers or nuts where the approved schedule calls for them.

Confirm separately

Confirm installation, testing, drilling templates and required documents with the project team; identify which are supplied separately.

03 / A comparable request

Six details that make offers clearer.

Product designation
State the exact product name, thread form or anchor system required instead of describing appearance only.
Project duty and substrate
Describe the base material, loading condition and any project-prescribed performance requirement for the fixing.
Dimensions and embedment
Record diameter, length, head type, drive or thread details and required embedment where relevant.
Material and finish
Specify the required metal grade or coating for the exposure, not only the visible colour.
Pieces and packs
Give the wanted piece count and ask the supplier to show pack contents, including washers and nuts.
Accessories and required evidence
List setting tools, collars or caps and identify which product documents are requested with the offer.
Illustrative request lines
Item & descriptionQuantity
FA-01Mechanical fasteners for steel-to-steel connection; diameter, thread and coating per project schedule, nuts included.5000 pcs
FA-02Anchors for concrete edge zone; exact anchor designation and embedment to be stated for each size line.850 pcs

Example quantities only; no live prices or supplier offers. Use your project schedule for final values and ask suppliers to list deviations.

04 / Compare the whole offer

Three checks before you decide.

Product and pack mismatch

Compare the quoted product name with the requested designation and check whether pack contents include matched parts.

Substrate and material differences

Verify the declared base material and coating against the approved requirement before comparing totals.

Separate installation components

List items supplied only as accessories, such as setting tools or sleeves, so unit comparison stays complete.

05 / Practical questions

Details worth clarifying early.

Do all anchor packages include the matched nut and washer?

Not always. Record the pack contents by line and state whether matched nuts, washers or sleeves are required in the same supply.

Can a similar anchor be quoted without naming the required product?

Only name the project-prescribed anchor first. Any quoted alternative should identify the product and the basis on which equivalence is claimed.

07 / Your next step

Turn your material schedule into a request.

Create a Matravo account to prepare your request. For account or sourcing-flow questions, visit support.