Rebar and structural steel, scheduled for the frame
List reinforcement bars and structural steel separately. Reference each bar, member and plate to the current drawing revision, with quantities, fabrication requirements, finishes and delivery details.
Identify the products you need.
Reinforcement bars
Use the bar schedule as the core reference. List diameters, lengths, bends, grades and quantities so cutting and bending can be priced clearly.
Structural steel members
Identify beams, columns, plates and connections by member mark or drawing reference. Request fabrication status separately from raw section supply.
Fabricated assemblies
For prepared frames or welded assemblies, describe the assembly schedule, coatings and dimensional checks rather than assuming what fabrication includes.
List materials, accessories and delivery terms together.
List main materials and accessories as separate items. Use this checklist to prepare the information needed before requesting quotes.
Main materials
Cover bars, structural sections, plates, couplers and connection items listed in the project schedules and drawings.
Complementary products and delivery details
Show embedded plates, splice locations and lifting points on the relevant structural details.
Ask what is excluded
Confirm cutting, bending, welding, drilling, coating, transport and unloading as included or separately priced services.
Details to include in your request.
- Product designation and grade
- State the exact reinforcing steel or structural steel grade, product form and any project-prescribed performance or dimensional requirement.
- Bar and member schedule
- Attach the current bar schedule and member list with drawing number and revision so offers follow one source.
- Dimensions and sections
- List bar diameters, section depths, plate thicknesses and lengths; identify permitted tolerances from project data.
- Quantity basis
- Separate tonnes, metres and pieces. State whether overlap, cropping or wastage allowances are included.
- Fabrication detail
- Describe required bending shapes, hole positions, weld preparations and edges using the schedule drawings.
- Finish and protection
- Ask for the specified coating, primer or corrosion protection to be referenced against the project requirement.
| Item & description | Quantity |
|---|---|
| RS-01Reinforcement bars for raft zone A according to the attached bar schedule, with bending listed as a separate item. | 18 t |
| RS-02Structural steel beams and connection plates for the mezzanine frame, fabrication items identified per member. | 9 t |
Example quantities only; no live prices or supplier offers. Use your project schedule for final values and ask suppliers to list deviations.
What to check when comparing quotations.
One revision across offers
Confirm each offer references the same drawing and schedule revision before comparing any price or quantity.
Fabrication split
Check cutting, bending, welding, drilling and coating as separate lines so raw material value stays visible.
Site handling limits
Match bundle sizes and delivery phases to crane capacity, storage areas and unloading responsibility at the site.
Frequently asked questions
Can one RFQ cover rebar and structural steel sections together?
Yes, but keep them as separate groups. Bars are usually measured by schedule length and mass, while sections follow the member list and fabrication status.
Does a quoted rebar rate cover cutting and bending?
Not automatically. Request a separate line for supply, cutting and bending so the fabrication scope is visible against the bar schedule.
Request quotes for your material list.
Create a Matravo account to prepare a request for quotation. Contact support for help with your account or request.